Canadian Payments Association

The Canadian Payments Association (CPA) decided to move their offices to 350 Albert Street, 8th & 9th floors in downtown Ottawa.  The relocation required to be done in a very limited schedule and Lundy was selected to do the Office Consolidation and Fit-Up.  All activities were discussed with the client and each member of the team documented the specific actions to be performed to produce the project deliverables.  This information gave Lundy sufficient detail to create a realistic construction schedule which showed an early completion date.  The Project team was motivated throughout the duration of the project and extremely pleased with how the project was delivered.


Contract    Stipulated Price 

Contract    $1,835,233

 

Contract Start   June 2014

Completion    October 24, 2014


Relevance to Project

  • Project in a building located downtown Ottawa: Parking was limited, special insurance requirements and access to site protocols were followed.
  • Project executed ahead of construction Schedule
  • Interior fit-up
  • Tight project schedule with fixed completion dates

Constructability Solutions

  • 8th floor load: Existing floor showed signs of deflection and additional cementitious topping was added to level the floor

Project Team

Gina Courtland
Project Manager

Richard Moss
Site Supervisor

Carmen Arango
Project Coordinator


client

CBRE Limited
Victoria Scott (613) 782 2266

ARCHITECT

LWG Architectural Interiors
Colette St-Denis Jolic (613) 739 3699

 

 

 

mechanical/electrical

McKee Engineering
Frank Munn (613) 723 9585